Hand and Gebel Present at Tilt-Up Convention
Karen Hand, President at Needham DBS, and Barclay Gebel, VP Operations at Concrete Strategies, teamed up to present the Case Study for Project Dylan to a packed house at the 2019 Tilt-Up Convention and Expo held in Atlanta.
The composite panel industry is on the frontier of emerging design technologies; the innovation is ripe and ready to propel our industry into the future. Project Dylan is a new prototype fulfillment center, and this seminar will use it as a case study to better understand today’s composite panel industry. The warehouse building’s slab-on-grade footprint is approximately 700,000 square feet, and it has an additional 1.95 million square feet of elevated deck. The exterior is clad with 330,000 square feet of insulated tilt-up panels.
The tallest panel stands at just over 81 feet tall, meaning Concrete Strategies (CSI) set a company record for the tallest tilt-up panel ever erected on a project, and an industry record for the tallest composite panel ever constructed. This was accomplished by using an innovative composite panel design by Needham DBS and Meadow Burke’s Super 62.
Related Posts
By accepting you will be accessing a service provided by a third-party external to https://www.needham-dbs.com/