Needham DBS delivered the remaining structural steel to Crystal Distribution in Waterloo Iowa.  The project is an expansion to the existing facility and consists of six building sections: an office, east dock/defrost section, operations section, west dock, freezer/cooler section and an engine room.  The final shipment of steel, 140 tons, arrived via eight trucks to the site January 25, 2022.